Clean rooms at the Head Office
- The Room 1
-
500 classes, 282 square meters, 5 meters
above the floor
- The Room 2
-
500 classes, 282 square meters, 5 meters
above the floor
- The Room 3
-
5,000 classes, 180 square meters, 5
meters above the floor
Clean rooms at the Chikatsu plant
- The Room 4
-
100 classes, 300 square meters, 2.7
meters above the floor
- The Room 5
-
500 classes, 900 square meters, 2.7
meters above the floor
Production Facilities
-
Dicing saw system / Water purification
systems
- Die Bonder / Wire Bonder
-
Clean baking furnace / Vacuum furnace
-
SMT line / Solder printer / Solder
appearance printer
- Clean bench
- Laser marker / Laser dispenser
- Coating potting device
- Desk robot ... etc
Measuring instruments
- Digital Microscopes
- Spectacle Analyzers
- Digital Oscilloscopes
- Digital Millimeters
- Memory HiCorders
-
Thermostatic Bath and Electrostatic Test
Equipments
Copyright (c) 1994-2026 COWBELL ENGINEERING CO.,LTD